What Happens After Floor Hacking? How to Prepare Your Floor Before New Tiles
Showrov Hasan
3 hours ago
3 min read
hacking
A rough, dusty floor is normal after old tiles come off. Here is what happens next, and why this stage decides how good your new flooring will look.
If you have just had your old floor tiles hacked off, the room can look worse than when you started. The floor is rough, there is dust everywhere, and the walls may have patches and open channels. This is a normal stage of renovation, and a careful team treats it as the most important one.
Whatever goes on top, whether tiles, vinyl or timber, will only be as flat and solid as the floor underneath.
Why the Floor Looks Rough After Hacking
When old tiles are removed, leftover adhesive, screed and cement stay behind. The surface is uneven, with high and low spots, and small bits of debris are mixed into the dust. Laying new flooring straight onto this causes hollow tiles, uneven joints and cracks later on.
Step-by-Step: How the Floor Is Prepared
1. Clear the debris
All broken tiles, rubble and dust are removed from the unit. A clean surface lets us see the real condition of the floor.
2. Check the floor level
We check the floor for high and low spots. Tiles need a flat base, so levels are marked before any repair starts.
3. Remove loose and damaged material
Weak or hollow screed is taken out, and stubborn leftover adhesive is scraped off. Only solid material should remain.
4. Repair and level the surface
Low areas are filled and the surface is levelled with floor screed or self-levelling screed, depending on how much correction is needed. Floor screed suits larger corrections, while self-levelling suits a smooth, fine finish.
5. Waterproofing for wet areas
In bathrooms and kitchens, waterproofing is checked or re-done before new tiles go down, because leaks are expensive to fix after the floor is finished.
6. Let it cure
The new screed needs time to dry fully before flooring is installed. Rushing this step is a common cause of cracks and loose tiles.
Patching the Wall Channels
In the photo above, you can see white patches on the wall. These are channels cut into the wall for electrical wiring. After the electrician has run the wires, the channels are filled and plastered flat so the wall is smooth again. Skipping a proper plaster finish leaves visible lines under the paint.
Common Mistakes to Avoid
- Tiling over an uneven floor. This leads to uneven joints and hollow-sounding tiles.
- Skipping the curing time. Moisture trapped in the screed can damage the flooring above.
- Patching walls before the wiring is done. The channels have to be reopened if wiring needs changing.
- Ignoring waterproofing. Leaks in wet areas are the most costly renovation mistake.
How Long Does This Stage Take?
It depends on the size of the unit, how much levelling is needed and how long the screed needs to cure. Most homes need a few days for preparation and curing before new flooring can start. We confirm the timeline during the site visit.
Frequently Asked Questions
Do I need to re-screed the floor after hacking tiles?
Not always. If the existing screed is solid and level, it can be cleaned and reused. If it is hollow, cracked or uneven, it should be repaired or replaced.
Can I lay new tiles over the old floor without hacking?
Sometimes, if the old floor is in good condition. Hacking is needed when tiles are loose, the floor is uneven or the waterproofing needs replacing.
Do I need approval for floor hacking in an HDB flat?
Some hacking works need approval or must follow HDB renovation rules. It is best to check before starting, and we can guide you on what applies to your flat.